 |
Product: CARB-CTR
Help Line: (713) 669-7869
BBS: (713) 669-7887 (14.4 Baud & above)
(713) 669-0078 (14.4 Baud & below)
Version
1.1: Facility name is on all reports. Winter gasoline will no longer
show a cap is exceeded when the RVP parameter is above 7.0 p.s.i. (this
is in the results window when checking for compliance). The CARB model
now allows concurrent Predictive Model Flat (PMF) specifications to be
used for different product codes. The compliance specification window has
a hidden date field that allows a user to check compliance of a non-PMF
specification through the date entered. This hidden field is activated
by double clicking anywhere on the specification window. To ease data entry
on the CARB specification window, we have added a function allowing the
user to copy the beginning batch ID to all parameters. Checking compliance
processing has been improved from 40 to 65 percent.
User
Group Minutes
Future
Enhancements
|